Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600683

- Product Categories
- Friendly Links
Information Name: | Five-hole Plum Weifang, Shandong five holes Plum |
Published: | 2014-11-19 |
Validity: | 30000 |
Specifications: | Weifang five holes Plum |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | HDPE pipe series Plum Plum Plum characteristics of porous integrated structure, stiffness, even by force. Product inner wall of the friction coefficient, wear rope light, construction is simple. Having a plurality of holes, holes can be set aside to improve the communication hole utilization. Product application temperature range is larger (+ 80-40), in tropical and cold regions can be used. Joint use of socket structure. Without the need for any tools to complete the connection between the tubes, ease of construction and maintenance. Plum conditions of life at depths greater than 30 years. Color performance pipe uniform color is white, according to user requirements, can also be customized to other colors. Pipe smooth, uniform color, does not allow deformation, distortion and other defects. Are not allowed inside and outside wall cracks and damage, perforation. Tag should durable and easy to identify. Laying waste Plum Note (1) pipeline design requirements and construction operations shall be as straight as can be covered with a layer of sand ditch uneven. Pipe trench should be removed before a hard thing, to prevent pipe deformation. Buried at the beginning, you should set aside 10-15CM porous tube wells in person to wear a cable. Tube blockage should be exposed to live in the human side of the sub-tube wells. When the pipe is strictly prohibited sediment contaminant tube. (2) a porous pipe connection to the pipe-shaped plum positioning ribs facing up, the ends of the pipe wall to clean up, and then directly inserted into the socket at one end, and then the end surface of a thick mat of wood, with a hammer beating plate so that the pipe socket place. In a direct bearing interface at the other end of the tube is inserted directly and the other socket in place, so be postponed to the next person at the well. In the actual construction, the length of each pipe connected together and are not necessarily the same as the length between the person well, in this case, based on the length of the actual person well from a good amount of pipe length, and with a hacksaw to saw, Be sure to saw flat tidy. After pairing is complete, one end extending into the man asked to use tube wells Sese good, to prevent foreign invasion. (3) The initial installation of the product, could be in the |
Admin>>>
You are the 8422 visitor
Copyright © GuangDong ICP No. 10089450, Zouping Tenda Plastics Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8422 visitor
Copyright © GuangDong ICP No. 10089450, Zouping Tenda Plastics Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility